The project included the detailed engineering for a multipurpose terminal, including a barge wharf for unloading wood logs, a waiting berth to receive the unloaded barges and an ocean wharf to unload chemicals and load cellulose. It also included the design of a 1.30km breakwater.
The terminal will handle, annually:
The barge and ocean wharf were design and constructed with precast concrete blocks that constitute a gravitational wall. The waiting berth was design with monopile dolphins.
PRDW executed the following studies:
Also coordinated and supervised the following services: