Whilst retaining the working aspects of the harbour, namely fishing, ship repair and tug berthing, the docklands have been upgraded with a mix of retail, commercial, hotel and residential development. Use of the harbour basins has increased with tourist and recreational boating. New water bodies have been added to the Waterfront by the creation of a yacht marina and a perched canal system that links the Waterfront to the City.
The professional services that have been provided for the Victoria and Alfred Waterfront have covered a wide range of projects including the following:
Planning and feasibility studies of marine aspects of:
Detailed design and construction implementation of contracts which included:
The project is ongoing and the current thrust of development is the final phase of development in Granger Bay.